This bridge is on the River Thames. It was completed in 1884. Atotal of 432 construction workers took eight years to build the bridge. The bottom part of the bridge opens and closes so that big ships can go up and down the river.
Took: van tardar
Build:part: part inferior
Ships: vaixells
Go up: pujar
Go down: baixar